Skip navigation
 Renewal EIS  |  Getting Involved  |  TAPS Guide  |  EIS Documents
  News  |  FAQ  |  Glossary  |  EIS Newsletter  
 

Previous  |  Next

6 Summary of Impacts - Proposed Action: Renew Federal Grant for 30 Years

The impacts of renewing or not renewing the Federal Grant can be divided into those associated with routine operations and those associated with spills.

Environmental Impacts from Routine Operations

Some of the more significant environmental impacts from routine operations under the proposed action are described in slides 7 - 9. A more detailed summary of the impacts under the proposed action (and the other two alternatives) is given in the main body of the FEIS in Table 2-1.

For More Information

More information about the environmental impacts from routine operations under the proposed action is available in the FEIS Volume 3, Sections 4.1 - 4.6, Proposed Action Alternative Analysis - Routine Operations.

PDF icon Sections 4.0 - 4.2 (828 KB, 74 pgs.)
PDF icon Section 4.3 (703 KB, 106 pgs.)
PDF icon Section 4.4 (967 KB, 146 pgs.)
PDF icon Sections 4.5 - 4.6 (781 KB, 108 pgs.)

Environmental Impacts from Spills

The environmental impacts associated with spills for the proposed action are described separately after the presentation of routine operational impacts, in Slide 10.

For More Information

More information about the environmental impacts from spills under the proposed action is available in the FEIS Volume 3, Sections 4.1 - 4.6, Spills Analysis for Proposed Action.

PDF icon Sections 4.0 - 4.2 (828 KB, 74 pgs.)
PDF icon Section 4.3 (703 KB, 106 pgs.)
PDF icon Section 4.4 (967 KB, 146 pgs.)
PDF icon Sections 4.5 - 4.6 (781 KB, 108 pgs.)

Previous  |  Next


 
  
Privacy/Security  |  Contact Us  |  About Us  |  Site Index